El Niño Is Coming: How to Get Your Warehouse Roof Storm-Ready

Hulsey Contracting Inc

When it comes to superior insulation solutions that stand the test of time, Hulsey Contracting Inc has always been at the forefront of innovation and excellence. Our commitment to providing our clients with the highest quality protective systems is matched by our…

Aerial drone view of a commercial roof by Hulsey Contracting

Forecasters are watching for a wetter than normal winter in Southern California this year. If you own or manage a warehouse in the Inland Empire, that should get your attention now, not in January when the first big storm is already sitting on your roof.

Big flat roofs take the hardest hit in a heavy rain year. Water has a lot of square footage to collect on, and it only needs one weak seam or one clogged drain to find its way inside.

Why one leak costs more than you think

A roof leak in a warehouse is rarely just a roof problem. It turns into a business problem fast:

  • Damaged inventory. Cardboard, pallets, and product do not survive a steady drip.
  • Soaked racking and equipment. Water on steel and electrical is never good news.
  • Slip hazards. Wet floors around forklift traffic are a safety and liability issue.
  • Lost time. Moving stock, cleaning up, and waiting on emergency repairs during storm season, when every roofer in town is booked.

Sealing a roof before the rain starts costs a lot less than cleaning up after it.

Your storm season roof checklist

Here is the short list we give every warehouse owner heading into the wet season. The first three your maintenance team can handle this week.

1. Clear drains, gutters, and scuppers

Leaves, trash, and debris pile up over a dry summer. A blocked drain turns a flat roof into a shallow pool, and standing water adds weight and finds every weak point. Clear them now and check them again after the first storm.

2. Inspect seams and every roof penetration

Roofs rarely fail in the middle of the field. They fail at the details: HVAC curbs, pipe penetrations, skylights, and transitions. Walk the roof and look for cracked sealant, lifted edges, and gaps around anything that pokes through.

3. Mark any low spots that hold water

If you see areas that stay wet for more than a couple of days after rain or irrigation overspray, mark them. Ponding is one of the clearest signs a roof needs attention, and it gets worse every storm.

4. Schedule a professional roof inspection

This is the one to do before the forecast turns. A trained inspector can spot early coating wear, moisture under the surface, and small failures that are cheap to fix now and expensive to fix in February.

Why spray foam handles a wet winter so well

Spray polyurethane foam (SPF) roofing goes on as a liquid and expands into one continuous layer across the entire roof. That matters in a heavy rain year for a few reasons:

  • No seams. There are no laps or fasteners for water to work its way through.
  • It wraps the details. Foam flows around HVAC units, pipes, and curbs, which are exactly the spots that leak on other systems.
  • It can be shaped to drain. Foam can be built up in low areas to help eliminate ponding.
  • It usually goes over your existing roof. In most cases there is no tear-off, so the building stays open while the work gets done.

Already have a foam roof? A coating inspection and recoat before the rain is the cheapest insurance you can buy. Foam roofs last because somebody keeps the coating in good shape.

Get ahead of the storms

Hulsey Contracting installs and repairs commercial spray foam roofs on warehouses, distribution centers, and industrial buildings across the Inland Empire and California. The best time to schedule your inspection is before everyone else does.

Request a roof inspection or call (951) 202-8584.

Hulsey Contracting Inc. | CA Lic. CSLB #827300 | Riverside, CA